top of page

Owner's Representative &
Construction Project Management

Independent oversight that protects your interests, your schedule, and your budget.

Why an Independent Owner's Representative

THE CASE FOR INDEPENDENCE

Marathon Group's principal began his career as a Local 94 Operating Engineer responsible for the refrigeration and mechanical systems of major commercial buildings.

Across four decades, he has personally directed construction project management on more than 17 million square feet of commercial real estate — from ground-up office development to mission-critical trading-floor environments to chiller, fire alarm, and elevator modernization programs in occupied Class A buildings. That trade-level foundation, layered with senior asset management and operations leadership, is what Marathon Group brings to every engagement.

FROM THE MECHANICAL FLOOR UP

Construction projects fail when owners don't have the bandwidth, the technical depth, or the independence to challenge architects, engineers, contractors, and vendors at the right moments. Marathon Group, LLC fills that gap. Engaged directly by ownership, the firm represents the owner's interests — and only the owner's interests — from project conception through closeout.

Most architects, engineers, and general contractors do excellent work — but their incentives are not always aligned with the owner's. An independent owner's representative has no design fee to protect, no construction profit to defend, and no vendor relationship to preserve. The result is straightforward, candid counsel and disciplined oversight focused entirely on the project's outcome.

Service Areas

​01 — Pre-Construction & Project Definition

Scope development, feasibility review, programming support, and budget validation before design begins.

​02 — Design Team & Contractor Selection

RFP preparation, qualified-bidder list assembly, bid analysis, contract negotiation, and award recommendations for architects, engineers, and general contractors.

​03 — Schedule & Budget Controls

Master schedule development, milestone tracking, cost reporting, and proactive identification of schedule and cost risks before they become impacts.

​04 — Construction Administration

Day-to-day oversight including site walks, OAC meeting coordination, RFI and submittal review, and shop-drawing tracking.

​05 — Change Order & Risk Management

Independent review and negotiation of change orders, claims analysis, and proactive risk mitigation throughout construction.

​06 — Quality, Safety & Code Compliance

Coordination with municipal authorities, code consultants, and third-party inspectors to ensure work meets contract documents and applicable codes.

​07 — Closeout, Punch List & Warranty

Punch-list management, O&M and as-built collection, warranty tracking, and post-occupancy issue resolution.

SCOPE OF WORK

Project Types

Ground-Up Office, Mixed-Use & Residential Development

Commercial Tenant Build-Outs & Space Alterations

Capital Improvement Programs

Mission-Critical Environments — Data Centers, Trading Floors, UPS / Emergency Generation

Elevator Modernization (controllers, destination dispatching, cab modernization)

HVAC Replacement & Upgrades

Boiler, Chiller & Cooling Tower Replacement

Fire Alarm & Life-Safety System Replacement

Building Management System (BMS) Upgrades

Co-Generation, Lighting Retrofit, Occupancy Sensors & Energy Management

Data & Telecommunications Redundancy (wired, wireless, DAS)

Security System Installation & Upgrades

Roof Replacement & Building Envelope Work

Lobby & Common-Area Renovations

Specialty Build-Outs (Life Sciences Lab, Government, Mission-Critical)

Building Repositioning & Major Renovations

THE CASE FOR INDEPENDENCE

Career Projects

The following projects were personally directed by the principal during senior leadership roles prior to founding Marathon Group, LLC. They illustrate the depth of construction project management experience that informs every Marathon Group engagement.

THE CASE FOR INDEPENDENCE

01 — 51 Astor Place

425,000 SF ground-up Class A office, Greenwich Village — operational launch including building systems commissioning and tenant onboarding.

THE CASE FOR INDEPENDENCE

02 — 101 Sixth Avenue / 825 Seventh Avenue

Single-to-multi-tenant conversion and complete critical-systems renovation.

THE CASE FOR INDEPENDENCE

03 — 270 Park Avenue — J.P. Morgan Chase

Mission-critical trading floors, UPS, emergency generation, co-generation, BMS, life-safety, and security systems.

THE CASE FOR INDEPENDENCE

04 — 388/390 Greenwich Street — Citigroup

Mission-critical trading floors, UPS, emergency generation, co-generation, BMS, life-safety, and security systems.

THE CASE FOR INDEPENDENCE

05 — Federal Aviation Administration

Major space renovations including the Air Traffic Control Operations Center.

THE CASE FOR INDEPENDENCE

06 — New York Genome Center

Computational genomic-biology research lab and office build-out at 101 Sixth Avenue.

THE CASE FOR INDEPENDENCE

07 — Turkish Consulate

Ground-up mixed-use ministry, office, residential, and auditorium facility for a foreign government.

THE CASE FOR INDEPENDENCE

08 — Ramsey Golf & Country Club

$21M master plan renovations to pool, clubhouse, and amenities — current Marathon Group, LLC engagement.

THE CASE FOR INDEPENDENCE

The Marathon Group Difference

THE CASE FOR INDEPENDENCE

Direct Principal Engagement

Every project is led directly by the firm's founding principal. Clients work with the decision-maker — not a junior associate handed the file.

THE CASE FOR INDEPENDENCE

Independent and Conflict-Free

Marathon Group holds no design, construction, or vendor allegiances. Recommendations are based solely on what serves the project.

THE CASE FOR INDEPENDENCE

40+ Years of Hands-On Experience

From Local 94 Operating Engineer to senior leadership at Avison Young, Edward J. Minskoff Equities, CBRE, Rockefeller Group, Reckson Associates, and Cushman & Wakefield — 17M+ SF of commercial real estate.

THE CASE FOR INDEPENDENCE

A Vetted Project Network

Marathon Group draws on a vetted network of architects, engineers, general contractors, MEP specialists, and trade subcontractors to assemble the right project team for each engagement, scaled to the project's specific requirements.

THE CASE FOR INDEPENDENCE

Considering a project?

Whether you're planning a tenant build-out, evaluating a major capital program, or in the middle of a project that needs experienced oversight, Marathon Group is available to discuss it. Initial conversations are confidential and at no cost.

bottom of page